Yen My II Industrial Park

Published on 21 - 03 - 2023
100%

 

 

Geographical location 

 

▪ Adjacent to the National Highway 39; about 5km from the National Highway 5A, 3km from the intersection of the Ha Noi - Hai Phong Highway.

▪ 30km from the center of Hanoi.

▪ 55 km from Noi Bai International Airport;

▪ 75 km from Hai Phong port, 120 km from Quang Ninh port.

 

Location

▪ Located in Yen My district, Hung Yen province.

Planning map 

 

 

Planning area

▪ Scale: 313.5 ha. In which, the area of industrial land for lease is 221.83 ha.

▪ Industrial land area for lease: 62.4 hectares, occupancy rate is 28.1%.

▪ The remaining industrial land area not yet leased: Approximately 159 ha.

Land sublease price associated with industrial park infrastructure 120 - 135 USD/m2

Term of land lease

▪ Up to June 02, 2065

Field of investment attraction

* Manufacturing and assembling data transmission equipment and components, mobile phones, computers and peripheral devices; software and digital content production; manufacturing and assembling electrical, electronic, refrigeration, optical, telecommunications, automobile, motorbike, and other motorized vehicles, machines and equipment; manufacturing mechanical products, machinery and equipment, manufacturing molds, jewelry; metal production (excluding the production of cast iron and steel billets); production of sports equipment, toys, production of building materials (excluding production of cement, clinker, bricks and tiles); manufacturing composite materials, flexible, super-durable, ultra-lightweight materials; industrial gas production; production and processing of agricultural products, food (excluding production of cassava flour, vermicelli, monosodium glutamate, sugar from sugar cane; processing aquatic products, seafood; slaughtering livestock and poultry), beverages, food breed; manufacture of paper products (excluding pulp and paper production), wood (excluding wood processing, wood chips from natural wood), plastic (excluding recycling of plastic scraps), rubber, plastics, non-metallic minerals and from steel, aluminum and alloys; manufacturing pharmaceuticals, cosmetics, packaging and labels; manufacture of medical equipment; manufacture of chemical products (excluding basic chemicals, detergents, additives, chemical fertilizers, plant protection chemicals); logistics services, warehouses, factories for rent, petrol stations; manufacture of supporting industry products (excluding textiles, garments, leather and shoes) on the list of priority development as prescribed by law and other industries producing products from new and high-tech technologies. 

 

Infrastructure

▪ Constructional site:  The ground has been already prepared for plant construction.

▪ Power supply: Power supply is stable through 110 / 22KV substation with the capacity of 63MVA.

▪ Water supply:  The water plant is built with the capacity of 6,000 m3 / day and night. 

▪ Waste water & waste treatment:  The wastewater treatment plant is built with a total capacity of 3,000 m3 / day and night. 

▪ Telephone & Internet: The telecommunications system meets international standards and always available to meet the needs of telecommunications, high-speed data transmission and domestic and international postal services. The underground fiber optic cable system is directly connected to the fence of each enterprise.

▪ Internal traffic:  The system of internal roads is built with a reasonable cross-section, ensuring means of transportation going to each factory easily and conveniently. Lighting systems are installed along the roads.

▪ Fire protection: The water supply system with fire hydrants is arranged along the roads of the Industrial Park. 

Social infrastructure and advantages

▪ Customs: Hung Yen Customs is currently headquartered about 6 km from the Industrial Park. All sealing and lead clamping procedures are carried out right at the factories in the Industrial Park.

▪ Bank: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for Investment and Development of Vietnam...) is located near the Industrial Park.

▪ Hospital: Pho Noi General Hospital (7 km away from the Industrial Park) is modernly planned and built to meet the needs of medical examination and treatment for workers in the Industrial Park.

Investment incentives

▪ Corporate income tax:

- To enjoy a tax rate of 10% within 15 years and a tax exemption for 4 years, a 50% reduction of the payable tax amount for 9 subsequent years, for income from the implementation of new investment projects in a number of preferential investment fields in accordance with the law on enterprise income tax.

- To enjoy a tax rate of 17% and a tax exemption for 2 years, a 50% reduction of the payable tax amount for 4 subsequent years, for income from the implementation of new investment projects in a number of fields such as high-grade steel production; production of energy-saving products; production of machinery and equipment servicing for agricultural, forestry, fishery and salt production; production of irrigation equipment; production and refining of animal feed, poultry, seafood.....

-  Corporate income tax is exempted for 2 years and to reduce 50% of payable tax amount for 4 subsequent years for enterprises implementing new investment projects in the IP.

▪ Import tax: Investment projects in the IP are exempted from import tax on imported goods to create fixed assets in accordance with the Law on Export and Import Duties.

Investment attraction

* The IP has received 42 projects (26 DDI projects and 16 FDI projects), with a total registered investment capital of about 2,736 billion VND and 186 million USD.

Investor

▪ Investor:   Hoa Phat Hung Yen Industrial Parks Infrastructure Development Company Limited.

 - Address: 39 Nguyen Dinh Chieu, Le Dai Hanh, Hai Ba Trung, Hanoi.

 - Tel: 024.39763889 Fax: 024.39763890;

 - Email: xaydung@hoaphat.com.vn

 - Contact person: Mr. Cuong-0903 248 441.

 

 

 

 

 

 

 

 

 

Latest new

Pho Noi Textile and Garment Industrial Park(21/03/2023 1:31 CH)

The Industrial Park No.3(21/03/2023 2:20 CH)

The Industrial Park No.5(21/03/2023 2:04 CH)

The clean industrial park(21/03/2023 9:55 SA)

The Industrial Park No.6(21/03/2023 9:39 SA)

The Industrial Park No.1(21/03/2023 9:34 SA)

Thang Long Industrial Park II (21/03/2023 2:57 CH)

Ly Thuong Kiet Industrial Park(21/03/2023 2:26 CH)

°